1. Home
  2. tie back

Deepwater Tieback-Cementing-Design Challenges and Engineering Approach

$ 21.50

4.9 (254) In stock

This paper focuses on cementing-design challenges and discusses the engineering techniques used to approach them.

2016 IADC/SPE Drilling Conference Abstracts - Drilling Contractor

Deepwater Tieback-Cementing-Design Challenges and Engineering Approach

OIL WELL CEMENT EVALUATION - CHL LOG

SF—Rosenberg (Subsea Drive Corp.)

Economic considerations and market condition effects in deepwater

OIL WELL CEMENT EVALUATION - CHL LOG

Letter Report Interim Report on Causes of the Deepwater Horizon

SF—Rosenberg (Subsea Drive Corp.)

Deepwater Horizon Accident Investigation Report

Deepwater horizon

Review of gas migration and wellbore leakage in liner hanger dual

Example HPHT well schematic.

What is subsea tie-back? In brief please. - Quora